To the central content area

Strengthen Sewage Sewer System Management and Continuous Water Monitoring System’s (CWMS) Transmission Quality Project

Absrtact
This is an administrative assisting project with the following goals: 1.To enforce water pollution prevention and effluent control of the industrial parks sewerage systems. 2.To improve the quality of data transmission and control strategy of the continuous wastewater monitoring system (hereafter refer as CWMS). 3.To maintain and better service quality of CWMS’s data transmission system. During the implementation period of this project, we had assisted and planned relevant administrative control tasks, including:(1)finishing relevant control data of the industrial parks sewerage systems for the past 3 years, control measures of the industrial parks sewerage systems refer to 110-year effluent standards, making inventory of self-discharging facilities in the industrial parks and put forward control recommendations , making 5 on-site inspections in the industrial parks, investigating the list of industrial parks without sewage system and exploring feasible alternatives, discussing the division of powers and responsibilities between the industrial parks and the agent operators and make suggestions, drafting industrial parks’ water pollution prevention and control plans and consolidating implementation results.(2)making the facility inventory which should be connected to the EPB and proposing problems and make suggestions, implementing 20 systemic and functional inspections and 10 parallel comparisons inspections of CWMS’s facilities, generalizing the control results of the CWMS’s facilities over the years and modify the CWMS’s systemic and functional inspection table, drafting CWMS’s facility data acquiring and handling system(DAHS) verification system and AI analysis plan(3)upgrading service quality of the CWMS’s data transmission system, waste (sewage) water automatic monitoring facility measure instruction and confirmation report log-in system, establishing transmission data distribution mechanism, connecting relevant systems, assisting in confirming abnormal problems and troubleshooting, supporting technical consultation of CWMS’s connected facilities, maintaining relevant systems, (4)tracking the regulated facilities’ CWMS installing progress, holding 3 education trainings and 1 workshop conference, analyzing the change trend of heavy metal emissions in the industrial parks over the past five years, auditing permit/DMR of the industrial parks sewerage systems and collecting the tracking outcomes by the EPB, statistics the commissioned agency to review the implementation results of the water pollution prevention and control measures plan, cooperating with the Open Data connection of relevant systems, and producing 8 related publicity posts and propaganda.
Keyword
industrial park sewerage system, self-discharging facilities, open data
Open
top